NanoMap-D三维表面轮廓仪简易操作手册
Vibration isolation pad locking screws.
A piece of tape with foam secures the stylus tip on the measurement head. Remove it after the stage
homing. (Figure 2)
(a) (b)
Figure 2. (a) Measurement head. (b) Tape over the stylus.
1.1.2 Electrical connections
There are two cables connections to the main platform: a line power cable and a USB cable. Both
connectors are at the back panel. (Figure 3)
NanoMap 500LS 3D Profilometer User’s Manual
aep Technology Page 2
The NanoMap 500LS system can take line voltages from 90VAC to 240VAC. The line power should
come from a filtered power strip with a good ground connection. Make sure the power switch is at the
“Off” position prior to plugging into the power outlet.
The USB cable should be connected to the computer designated USB port. The port is not
interchangeable without the modification of the configuration files. After the USB system cable is
connected, connect the keyboard and mouse, as well as other USB devices if available.
Figure 3. Line input and USB connection at the back panel.
1.1.3 Power on and off
All the peripherals such as the computer, monitor, and printers should be turned on prior to the power up
the main system. Once the entire system completes its physical installation and all the connections are
secured, power up computer. After the computer finishes its boot up sequence, turn on the main system
by using the power switch from the back panel.